Commissioning is the start, not the finish.

Stable production depends on planning, quality, maintenance and traceability systems running from the first batch.

Systems

Operating systems to put in place.

Production Planning

Convert demand into a realistic, sequenced production plan.

SOPs & Work Instructions

Document how each operation is performed and verified.

Operator Training

Qualify people against the work they perform.

Supplier Qualification

Approve suppliers before they are relied upon.

Incoming Inspection

Verify material before it enters the process.

In-process Inspection

Detect deviation while it can still be corrected.

Final Inspection

Confirm product conformity before release.

Corrective Action

Address causes, not just symptoms, and confirm effectiveness.

Calibration

Keep measuring equipment trustworthy and traceable.

Maintenance

Plan machine attention instead of reacting to breakdowns.

Spare Parts

Hold the parts that protect critical uptime.

Traceability

Link material, process and product records.

Safety

Design safe work into the process and the layout.

Metrics

What to measure.

Figures shown are illustrative examples only.

Capacity Utilisation

72%

First-Pass Yield

94%

Rejection Rate

2.1%

Machine Uptime

88%

Overall Equipment Effectiveness

61%

On-Time Delivery

91%

Changeover Time

38 min

Customer Complaints

3 / quarter

Energy per Unit

1.8 kWh